Municipal Waste Division

Municipal Waste Infrastructure — Built for Public Service

Truett Construction partners with municipalities and public authorities to design, build, and maintain waste management infrastructure — compliant, durable, and built to serve communities for decades.

25+
Municipal Contracts
12M+
Tons Capacity Built
100%
Regulatory Compliance
7
State Markets
Services

Municipal Waste Management Services

Every service backed by Truett's vertical integration, meticulous documentation, and a team that treats your project like our own.

Landfill Cell Development
New MSW cell construction: mass earthwork, HDPE and GCL liner system installation, leachate collection, gas management infrastructure, and complete CQA documentation package.
Transfer Station Construction
Reinforced concrete tipping floors, compactor equipment pads, truck bay framing, stormwater containment, leachate collection, and full site work including scales and gatehouse.
MRF Construction
Single-stream and dual-stream materials recovery facility construction. Tipping floors, equipment foundations, sorting platform framing, bale storage, and fire suppression coordination.
Landfill Closure Systems
Engineered closure cap construction: final grading, barrier layer, drainage layer, vegetative cover, gas extraction, and post-closure drainage infrastructure.
Leachate Management
Collection ponds and lagoons with liner systems, force main conveyance, pumping stations, aeration pre-treatment, spray irrigation systems, and monitoring infrastructure.
Environmental Monitoring
Groundwater monitoring well networks, perimeter gas probes, surface water sampling stations, stormwater BMPs, and access road construction for compliance monitoring access.

Ready to Start Your Project?

Tell us your scope. We'll deliver a detailed estimate and preliminary schedule within 48 hours.

Get Free Estimate Call (540) 825-6006
The Difference

Why Truett for Municipal Waste Management

01

Regulatory Fluency

EPA Subtitle D, Virginia DEQ solid waste regulations, Maryland MDE requirements, and CQA documentation standards — we know them inside and out before mobilization.

02

Liner System Expertise

Certified geomembrane installers, GPS-controlled subgrade prep, and full CQA coordination mean your liner system passes regulatory review the first time.

03

Public-Sector Experience

We understand public procurement, prevailing wage, bonding, and multi-stakeholder oversight that comes with publicly funded infrastructure.

04

Operational Continuity

Active landfills never stop receiving waste. We sequence construction to maintain permitted active cell capacity throughout every project phase.

Regulatory Fluency

Truett Standard

Liner System Expertise

Truett Standard

Public-Sector Experience

Truett Standard

Operational Continuity

Truett Standard
How We Work

Our Municipal Waste Management Process

Disciplined planning and documented execution — from first call to final handoff.

01
Permit Review
Review all permits, engineering packages, and CQA plans. Lock in long-lead materials.
02
Stakeholder Setup
Establish communication protocols with owner's engineer, CQA consultant, and regulatory agency.
03
Earthwork
GPS machine-controlled subgrade to ±0.1 ft, density tests at every lift.
04
Liner & Utilities
Certified installers, continuous CQA monitoring, seam testing, and pressure tests.
05
Documentation
Complete CQA package submitted to engineer of record and regulatory agency for certification.
Client Stories

What Clients Say

"Truett built our new MSW cell on time with a CQA package that sailed through DEQ review. Their coordination with our engineer and CQA consultant was seamless from day one."

Robert Hensley

Director of Public Works, Regional County Government

Northern Virginia

"The transfer station came in on budget despite two significant scope additions. Their project management kept the county board informed at every milestone."

Sandra Polk

Solid Waste Division Manager, Municipal Authority

Mid-Atlantic Region

Explore More Divisions

Civil Construction Trucking & Logistics Land & Property

Municipal Waste Management Built on Truett Standards

One call. Complete accountability. From first estimate to final handoff — Truett delivers.

Start Your Project (540) 825-6006